Skip to content Sensor boardPCB tracesDevice enclosureFirmwareOTA updateCellular signalBase stationSIM cardBattery, fullBattery, lowVoltageCurrent waveformMeterSolar panelEV chargerHeat pumpInverterDistribution boxCloudDatabaseDashboardAlertAnomaly detectionForecastReporting intervalTemperatureSitePower saving modeHandover documentsBook a callFixed scope agreedOur team
eldr systems
Scoped per device · Quoted after a scoping call

2G/3G migration sprint

Moving a device off a network that is being switched off — module choice, firmware port, power budget and an operator test report.

What you get

  • Module selection, with the trade-offs written down rather than asserted
  • The firmware ported, with the cellular stack reworked for PSM and eDRX
  • A power budget for the new design, measured rather than calculated
  • An operator test report covering attach, reconnect and transfer

Who this is for

Anyone holding a deployed fleet on a network with a published shutdown date. The deadline is set by the operator, which makes this the one piece of work that cannot be deferred.

What we need from you

The current device and its firmware source, the countries and operators it runs on, and the shutdown dates you are working against.

Book a 20-minute call [link pending] All offers →